Hydrodam Costs

fuel

Major Capital Allocation

fuel

200 MW SMALL HYDRO DAM PROJECT COST = 1.2 BILLION USD

500 MW LARGE HYDRO DAM PROJECT COST = 2.5 BILLION USD

RETAIL ELECTRICITY CHARGED PRICE = 19-20C USD

SOUTHEAST ASIA HAS NO MORE PLACES TO PUT HYDRODAMS, THE WHOLE REGION IS BACKING UP WITH SALT OCEAN WATER DESTROYING THE FARMLAND AND IS SET TO BE THE BIGGEST GLOBAL ECOLOGICAL LONG TERM DISASTER IN HISTORY SECOND ONLY TO FUKISHIMA. THERE ARE 20 MORE HYDRODAMS GOING UP ON TOP OF THIS ECOLOGICAL AND HUMANITARIAN CRISIS OF EPIC PROPORTIONS ALREADY. HYDRO PLANTS ALSO RUN DRY IN DRY SEASON IN CAMBODIA AND THUS AREN’T RELIABLE.

fuel

200 MW DIESEL PROJECT COST = 100 MILLION USD

500 MW DIESEL PROJECT COST = 250 MILLION USD

RETAIL ELECTRICITY CHARGED PRICE = 19-20C USD

DIESEL IS POLLUTIVE, AND HIGHLY EXPENSIVE OVER THE LONG TERM BOTH IN COST PER KILOWATT BUT ALSO IN TRADE BALANCE DEFICIT, ENVIRONMENTAL TOXINS, REAL HUMAN DEATHS DUE TO THESE POISONS, CONTRIBUTIONS TO GLOBAL TERRORISM FINANCING, AND HIGHER TRANSPORT COSTS AND THUS LOWER ECONOMIC GROWTH FOR THE ECONOMY WORLDWIDE. WITH NOWHERE TO PUT HYDRODAMS ANYMORE, THIS IS THE ONLY OPTION BESIDES TOXIC COAL, BUT FOR AOE.

fuel

200 MW SMALL HYDRO DAM PROJECT COST = 2 BILLION USD

500 MW DIESEL PROJECT COST = 250 MILLION USD

RETAIL ELECTRICITY PRICE CHARGED = 16-30C USD check

1,960 AOE 100 KW REBUKER SYSTEMS STACKED 14 LONG X 14 WIDE X 10 STACKED HIGH TAKE UP JUST 1,000 SQUARE METERS OF SPACE. 30MX30M. THIS IS JUST 1/7TH THE SIZE OF YOUR AVERAGE FOOTBALL FIELD OF 7,160 SQ METERS. NO MAJOR POLLUTIONS LIKE DIESEL, NO IMPORTED TOXIC ENERGY, NO TRADE DEFICITS, NO TERROR FINANCING, RELIABLE ENERGY 24 HOURS A DAY, AND MUCH MORE EFFECTIVE. CAMBODIA AND MYANMAR ALONE NEED 105,000 MW BUILT. AOE COULD ALLOCATE 1,050 BILLION (1 TRILLION) INTO JUST THESE PROJECTS AND MARKETS ALONE. WE ARE SET TO RUN 20+ BILLION THROUGH AOECOIN OVER 10 YEARS JUST HERE.

Capital Allocations 10 B

aoe fc divistion

2 BILLION IN FC PLANTS CAMBODIA

2 BILLION IN FC PLANTS MYANMAR

2 BILLION IN FC PLANTS INDIA

2 BILLION IN FC PLANTS PHILIPPINES

500 MM FULL ROBOTIC FACTORY

AOE ANGKOR SOLAR

20 MM FOR SOLAR LOCATIONS

+ 10 MW OWNED SOLAR FARM

E=MINECLEANERGY2

1B IN MINES

E=FICLEANERGY2
+ LOAN PRODUCT 2
SHOCKPOSSIBLE
AOECOIN MALL
(LEGAL SERVICES)

300 MM LOAN PORTFOLIO + SETUP

1B CAPITAL AND LOANS

100 MM MANUFACTURING + BOARDS

10 MM SETUP + INVENTORY

5 MM SETUP + CAPITAL

10 B CAPITAL CAN ALLOCATE

THERE ARE A SIGNIFICANT NUMBER OF GRID BUILDERS, GLOBAL AND REGIONAL ENGINEERING FIRMS, MAJOR CONSTRUCTION PROJECT CONTRACTORS, AND GLOBAL COMMERCIAL AND PROJECT FINANCE SOURCES WHERE WE COULD BUILD PROJECTS ALLOCATING 10-100 BILLION OVER THE NEXT 10-15 YEARS JUST IN POWER PLANTS, AND EVEN MUCH MORE IN OUR FUTURE DIVERSIFIED VERTICALS. YOU WANT SHOCK? YOU WANT CHANGE? YOU WANT TO CHARGE UP HUMAN DEVELOPMENT GDP POTENTIAL? AOECOIN